Work consisted of a stage repair to various damaged areas in the Scottish Rite Cathedral’s auditorium which was built in 1922. Restoration included a new wood floor in the damaged area, as well as refinishing 3,000 sf of flooring. This auditorium has a seating capacity of 2,062 which hosts events for corporate seminars, lectures, pageants, musical performances and weddings.